CPCCCO3055 Install topping slabs (Release 1)

$599.00 AUD Price excludes GST

Application

This unit of competency specifies the skills and knowledge required to install bonded and unbonded topping slabs to existing concrete on residential, commercial or civil construction sites.

It includes grinding and scabbling preparation techniques.

It applies to concreters working as members of a team with at least a moderate degree of autonomy. They would be expected to complete routine activities without close supervision.

Licensing, legislative, regulatory or certification requirements apply to this unit of competency in all states and territories except Tasmania. Relevant state and territory regulatory authorities should be consulted to confirm these requirements.

Pre-requisite Unit

CPCCWHS2001 Apply WHS requirements, policies and procedures in the construction industry

Unit Sector

Construction

Contains the following documents

  • Assessment Matrix (Mapping Document)
  • New Assessor Workbook/Guide (in MS Word Format)
  • New Cover Sheet
  • Learner Guide  (in MS Word Format)
  • New Learner Evidence Document
  • Learner Workbook (in MS Word Format)
  • New Observation and Demonstration Checklists
  • New Session Plan (in MS Word Format)
  • PowerPoint presentation
  • Supporting documents:
    • Contextualisation guide
    • Training and assessment strategy (TAS)
    • RTO Materials statement of validation
    • Student validation survey
    • Work placement logbook
    • Workplace documentation
    • Workplace evidence

 

For more information please contact us on sarah@rtomaterials.com.au